Email

info@ckjvn.vn

Hotline

(+84) 24 3762 4555

Address

29th Floor East Tower, 2901 Hanoi Lotte Center, 54 Lieu Giai St., Ngoc Ha Ward, Hanoi, Vietnam.

CONSTRUCTION F1 RACING HANOI

The total planning of the Formula 1 racetrack project in Hanoi is 88 hectares. In which, a part is of […]
Tỉnh thành: Le Quang Dao, Me Tri, Tu Liem, Hanoi
Năm khởi công: 2019
Năm hoàn thành: 2020
admin
20 June, 2022

The total planning of the Formula 1 racetrack project in Hanoi is 88 hectares. In which, a part is of the My Dinh sports complex. And a part of the planning the public transport system. The track is designed by the German Tilke Group, so it offers many clever cuts.

Location: Hanoi, Vietnam

Investor: Vietnam Grand Prix Co., Ltd

Funding source: Private equity (BT) Implementation period: March 20, 2019 – April 20, 2020

Project information:

  • Total area: 88 ha
  • Vietnam F1 race track has a total design length: 5.57 km.
  • In the entire length of the track will be designed 22 turns.
  • The main straight road has a length of 1.5km.
  • Design speed up to 335km/h.

Scope of work:

– Design a pedestrian bridge over the track

– Supervising the construction of items: pedestrian bridge and the entire stand item

Role: subcontractor